This facility consists of an approximate 32,124 Sq. ft. manufacturing plant including a 2-storey, 6,878 Sq. Ft. office. The overall building was constructed in phases. The plant is constructed with conventional structural steel framing providing clear span manufacturing space. The roof structure is open-web steel joists with metal deck. The exterior envelope of the plant is enclosed with pre-finished insulated metal siding, concrete block. The roofing is a single-ply EPDM roofing membrane that is ballasted. The office façade is built with an aesthetic blend of prefinished metal architectural panels, pre-finished metal siding installed horizontally, curtain wall glazing systems with reflective tinting and E.I.F.S. (stucco). The facility was designed and constructed to reflect clean manufacturing as pharmaceutical product equipment is designed and manufactured at the facility.

Select Tool – Main Plant
The industrial manufacturing facility totals 32, 303 square feet overall including a two-storey, 6,759 Sq. Ft. office area and approximately 25,544 Sq. Ft. of plant