- A complex machine foundation was a key component the Rosati engineering team had to design and install as part of this new 6,250 sf addition
- This addition will allow the company to expand its manufacturing space as well as add a new compressor room, washroom and a 25-ton crane extension.
- The design-build included a complex machine foundation with a built in trough system.
- The foundation is designed to hold a new lathe machine weighing more then 147,000 pounds when fully loaded, allowing them to turn-key repair extremely large components.

Dongshin Motech Ltd.
This project is comprised of 91,670 Sq. Ft. of Manufacturing Area, a 15,000 Sq. Ft. 2-Storey Office and Manufacturing support spaces including, Chemical Storage, Compressor