This cross-dock facility was conventionally constructed using architectural block for the office façade, full height pre-finished metal siding walls in the dock area with open web steel joists and ballasted EPDM roofing. The facility is comprised of 19 dock doors and one ramped level-entry door. The office was constructed in an upper mezzanine that will allow for future office expansion to meet requirements of this client. The total facility is comprised of 14,809 sq. ft.

Vespa Farms
After meeting with several contracts, a Ruthven company chose Rosati’s pre-engineered Butler Building system for its compelling combination of superior quality and competitive pricing. Rosati

