Kingsway Lodge, an addition to St. Mary’s Rest Home in London, was a two-storey addition consisting of approximately 55 beds. The addition was constructed with cast-in-place concrete and concrete masonry foundation systems, pre-cast concrete floor slabs, brick veneer and curtain wall exterior cladding with metal stud construction. The structural system was load-bearing masonry, steel joists and metal deck. The addition consisted of dining room, multi-purpose rooms, kitchen and laundry facilities and also included elevator systems.

Dental Health Center
This multi-unit professional office facility encompasses over 16,000 Sq. Ft. including basement area. The facility includes five (5) units including a 6,400 Sq. Ft. Dental