This two-storey (plus basement) expansion to the rest home was constructed with cast-in-place concrete and concrete masonry foundation systems, pre-cast concrete floor slabs, brick veneer and curtain wall exterior cladding with metal stud construction. The expansion consisted of approximately 41 beds as well as dining room, multi-purpose rooms, games rooms, kitchen and laundry facilities and included an elevator system.

Windsor Christian Fellowship
This 20,183 Sq. Ft. new Fellowship Hall was constructed of a structural steel frame with precast concrete floor slabs. It features a stunning entrance canopy