Regency Park is comprised of 47 suites and 95 beds. The three and half storey (plus basement) rest home was constructed with cast-in-place concrete and concrete masonry foundation systems, pre-cast concrete floor slabs, brick veneer and curtain wall exterior cladding with metal stud construction. The structural system was load-bearing masonry, steel joists and metal deck. This facility consisted of dining room, multi-purpose rooms, games rooms and kitchen and laundry facilities and also included elevator systems.

Caps Canada Manufacturing & Office Facility
Originally constructed for Technophar, this facility consists of a total of 103,318 Sq. Ft. including 60,410 Sf. Ft. of manufacturing space, 32,268 Sq. Ft. of