The manufacturing expansion, design-build project adds a 40,000 sf Butler pre-engineered building. The site was also expanded and developed to allow over 200 Trucks that
This project included the renovation and upgrade of the facility to comply with Health Canada, GMP (Good Manufacturing Practice) and FDA (Food & Drug Administration)