- The manufacturing expansion, design-build project adds a 40,000 sf Butler pre-engineered building.
- The site was also expanded and developed to allow over 200 Trucks that are in staging and ready for customer delivery.
- Rosati was also asked to design-build an Interior Office Renovation and expansion which allowed for ten additional Office workstations, a New Plant Lunchroom, New Plant Washroom and a new Locker Room.
- The expansion will be used to increase manufacturing space for the company’s Fleet services and Work Trucks Plus programs.

A. P. Plasman Trimplas
The facility includes a 97,218 square foot plant, offices and loading docks. The plant is constructed with conventional structural steel framing. The roof structure is





