- This Butler Pre-Engineering Expansion was design-built to tie-into the original facility that was constructed in 2014. The 125ft. clearspan (no columns) structure was designed to match the single slope structure, but with added air-conditioning for the Expansion.
- The newly expanded facility totals 29,400 Sq. Ft

Select Tool – CNC Plant
This 21, 561 Sq. Ft. Industrial manufacturing facility was developed to be Select Tool’s CNC Plant. The plant was specifically designed to accommodate the CNC



