This 20,183 Sq. Ft. new Fellowship Hall was constructed of a structural steel frame with precast concrete floor slabs. It features a stunning entrance canopy and rotunda leading to a Chapel, Banquet Hall, Commercial Kitchen facilities and Administrative Offices. This project also included façade renovations to the existing building. Subsequent to being awarded this publicly-tendered project, Rosati proposed several Value Engineering solutions that reduced the project cost by an additional 9% without affecting the project quality or design integrity. As a consequence of this dedication to quality and commitment to value, Windsor Christian Fellowship has engaged Rosati construction on all their subsequent projects.
Ecole Secondaire Michel-Gratton
This 64,000 square foot project is constructed over two floors and is a LEED Gold project. The school board, Conseil scolaire de district du Centre-Sud-Ouest,