This two-storey (plus basement) expansion to the rest home was constructed with cast-in-place concrete and concrete masonry foundation systems, pre-cast concrete floor slabs, brick veneer and curtain wall exterior cladding with metal stud construction. The expansion consisted of approximately 41 beds as well as dining room, multi-purpose rooms, games rooms, kitchen and laundry facilities and included an elevator system.
Windsor-Detroit Tunnel Plaza
This project combined the new 425 sq. meter Maintenance Building and the 980 sq. meter CBSA Building including inspection booths. Both facilities were constructed with