This cross-dock facility was conventionally constructed using architectural block for the office façade, full height pre-finished metal siding walls in the dock area with open
This Butler Pre-Engineering Expansion was design-built to tie-into the original facility that was constructed in 2014. The 125ft. clearspan (no columns) structure was designed to