As the chosen design-build / Construction Manager for the overall Trinity Plaza Development, Rosati was also responsible for the design and development of the Home Hardware Retail Facility. The 15,072 Sq. Ft. facility was conventionally constructed and included over 3,000 Sq. Ft of outdoor covered sales area. The interior spaces included the sales area, warehousing, administration offices, staff lunch room and a seasonal storage area. The site includes several customer pick-up areas and a loading dock for deliveries. The building exterior finishes included an architecturally blended design consisting of natural stone, EIFS, architectural siding panels and raised canopies detailed with large natural timbers and down lighting. As part of this overall first phase of the retail development, Wyoming Street was also completely upgraded to allow for increased streetscaping and a welcoming access to the Trinity Plaza Development

CAW Local 195 / 2458
This 14,000 square foot conversion/renovation involved a complete overhaul of this former elementary school that was originally constructed in 1955. Working with Archon Architects, Rosati