This project was completed at the Thames Lea Shopping development and included the partial demolition of the existing plaza to accommodate the new 25,000 Sq. Ft. SportChek Retail Store. The project was conventionally constructed with a combination of load bearing masonry and post and beam construction. The main façade as completed with a combination of brick masonry, EIFS, stone masonry, glazing and architectural canopies. The storefront was also designed to blend with the future plaza façade renovations project that was completed following the SportChek project.

Windsor-Detroit Tunnel Plaza
This project combined the new 425 sq. meter Maintenance Building and the 980 sq. meter CBSA Building including inspection booths. Both facilities were constructed with