This Butler Pre-Engineering Expansion was design-built to tie-into the original facility that was constructed in 2014. The 125ft. clearspan (no columns) structure was designed to
This project included three (3) main phases that are being completed simultaneously. The initial phase included the conversion of an existing 245,000-sq. ft. industrial building