Project - Dongshin Motech Ltd.

Dongshin Motech Ltd.

Location: Windsor, ON
Category:
Size: 106,880 Sq Ft

Description

  • This project is comprised of 91,670 Sq. Ft. of Manufacturing Area, a 15,000 Sq. Ft. 2-Storey Office and Manufacturing support spaces including, Chemical Storage, Compressor Room, CMM Room, Maintenance Cribs and Plant Lunch and Washroom facilities.
  • Manufacturing Area includes an 18,000 Sq. Ft. independently enclosed specialized Electro-Static (ESD) Fabrication Area.
  • The facility included six(6) loading docks, 10-ton cranes, specialized machine foundations, specialized plumbing systems.
  • The project was master planned to have 3-phases totaling over 271,000 Sq. Ft.

Related Projects

A. P. Plasman Trimplas

The facility includes a 97,218 square foot plant, offices and loading docks. The plant is constructed with conventional structural steel framing. The roof structure is

Learn More »

Vistaprint – Phase 3

This clean facility was design-built with employee comfort in mind. The manufacturing area was designed with sound-deadening roof and wall systems, increased day-lighting, in-floor heating

Learn More »